The Road to the House

The road was surveyed and dug in 2001.

The surveying was initially done by Graham & Clint Fern and checked by Richard Walker. This was followed by the excavation of the road by Trev Wishart, a master of the digger.

The road had two considerations in it's path - first the site for the house had to be got up to and second to avoid the old growth bush. This meant that quite a circutous route was mapped out and dug. The end result was well worth the effort.

The pictures...2001 Surveying

First clear a path and measure the inclination of the slope.....


First cut is the deepest

Then bring in Trev (with help from Geoff) to make it happen...

The culvert

The drainage system

Tidy it up!

Finishing it off

2002

Stabilising the culvert & bringing in the water tank



© 2008